One of the biggest challenges was to cover the metope of the Peace and Friendship Stadium on behalf of Saturn Hellas.
The project was assigned to us on Friday noon, when the files from the Advertising Agency were sent to us. The time we had for the production and installment was the weekend that followed.
Client: SQUAD Advertising Agency
On behalf of: Saturn Hellas
We needed 3 truck-mounted aerial cranes and 8 persons for its installment.
The total volume of the project was 1000/m2.
The project was successfully completed at the time demanded by the advertising agency.
The material used was coated tarpaulin at 550gr/m2.